Standard for assigning people to work: role catalog, capacity model, allocation matrix, and conflict resolution.

Owner: Resource ManagerApprover: PMO DirectorVersion: 2.3Updated: 12/12/1969

1. Purpose

Match the right people to the right work with transparency, fairness, and capacity awareness.

2. Scope

All UBC delivery roles and projects.

3. Definitions

  • Role catalog — The authoritative list of delivery roles with required skills and seniority.
  • Allocation — A named person committed to a project at a % capacity for a period.
  • Capacity — Available working time after PTO, training, and non-project overhead.

4. Roles & Responsibilities (RACI)

ActivityRACICadence
Maintain role catalogResource ManagerPMO DirectorFunction leadsPMOQuarterly
Publish capacityFunction leadsResource ManagerHRPMOWeekly
Request allocationsPMPMO DirectorFunction leadsTeamPer project
Resolve conflictsResource ManagerPMO DirectorFunction leads, PMsSteeringAs needed

5. Procedure

  1. Maintain the Role Catalog with required skills, seniority band, and rate card.
  2. Function leads publish weekly capacity per person (baseline − PTO − training − run-the-business).
  3. PMs submit allocation requests specifying role, skills, % capacity, and dates.
  4. Resource Manager runs the weekly allocation forum to place people to work.
  5. Assignments are recorded in the Allocation Matrix with % capacity and end date.
  6. Conflicts (over-allocation, skill mismatch) are resolved using prioritisation rules: contractual > safety > revenue > internal.
  7. Backfill: for absences > 5 days, propose backfill within 2 business days.
  8. PTO conflicts: honour submitted PTO; PM re-plans the schedule.
  9. Quarterly, publish the Utilisation Report (target 75% billable, 80% for contractors).

6. Inputs & Outputs

Inputs

  • Role catalog
  • Weekly capacity
  • Project allocation requests

Outputs

  • Allocation matrix
  • Utilisation report
  • Backfill plan

7. Controls & Metrics

MetricTarget
Over-allocation events≤ 2 per week
Utilisation (billable)≥ 75%
Backfill within SLA (2 business days)≥ 90%

8. Exceptions & Escalation

  • Emergency staffing (Sev 1 incident, regulator request) overrides the weekly forum with Resource Manager and Director approval.
  • Cross-portfolio conflicts escalate to the Portfolio Steering Committee.

9. Records & Retention

RecordRetention
Allocation matrix3 years
Utilisation reports5 years
Role catalog historyPerpetual
  • SOP-PM-04
  • SOP-PM-05
  • SOP-QMS-07

11. References

  • PMBOK 7 Team
  • CMMI-DEV IPM (Integrated Project Management)

12. Revision History

See the Versions tab for the full change history maintained by the Auto-Doc Engine.


Document code: STD-PM-ALLOC · Aligned to PMBOK 7 Team / CMMI OT, IPM. Controlled document — reproduction outside the UBC QMS requires the Quality Manager's approval.